Control Systems:
ISO9001, TS16949.
QC Staff:
45 to 60.
Materials/Components:
• Supplier investigation.
• Material in-put inspection.
• Tracibility system.
Procedures/testing Details:
Part qualification: first-piece inspection at the start of each production run.
SPC: variable and attribute control charting during the production run.
Part evaluation: last piece inspection at the end of each production run.
Final audit: random sampling of each ship lot for compliance of key characteristics.
Other Information:
Advanced quality and production planning:
• A part control plan.
• A process flowchart.
• Process failure mode and effects analysis.
• A full metrology review of the key parameters.
• A full dimensional layout.