Control Systems:
ISO9001, TS16949. 
 
QC Staff:
45 to 60. 
 
Materials/Components:
•  Supplier investigation. 
•  Material in-put inspection. 
•  Tracibility system. 
 
Procedures/testing Details:
Part qualification: first-piece inspection at the start of each production run. 
SPC: variable and attribute control charting during the production run. 
Part evaluation: last piece inspection at the end of each production run. 
Final audit: random sampling of each ship lot for compliance of key characteristics. 
 
Other Information:
Advanced quality and production planning:
•  A part control plan. 
•  A process flowchart. 
•  Process failure mode and effects analysis. 
•  A full metrology review of the key parameters. 
•  A full dimensional layout.